Day 3 - framing has started.
To the left of the fireplace looking at the craft room.
To the right of the fireplace looking at the craft room.
By the back door looking into the craft room towards the 1/2 bath.
In the craft room looking at the library.
Middle of the library looking to the front of the house and the nook.